• Published on

    Visit Saudi At Dubai 7’s

    visit-saudi-dubai-outdoor-terrace-seating-2024

    At the Emirates Dubai 7’s tournament 2024, Visit Saudi created a dedicated hospitality space where guests could discover more about the Kingdom’s destinations, culture and growing tourism offering.


    Evolution Technical was appointed to provide the complete audio-visual setup for the activation, combining branded content, live event coverage and carefully distributed sound to create an engaging environment within one of Dubai’s busiest sporting events.

    The Challenge


    The hospitality tent needed to perform as both a welcoming guest space and an active tourism showcase. Visitors had to be able to explore destination content while remaining connected to the wider Dubai 7’s programme, all within a busy venue experiencing continuous footfall throughout the day.


    The technical system therefore needed to be visually clear, easy to operate and dependable over extended show hours. Audio also had to support background music, announcements and guest interaction without overpowering conversations inside the hospitality environment.

    visit-saudi-dubai-main-seating-hall-2024

    The Solution


    A network of large-format television displays was positioned throughout the tent to keep branded content visible from different areas of the space. BrightSign media players managed destination films, cultural features and tourism messaging, while selected screens also received live event feeds.


    For audio, a compact L-Acoustics system using 5XT loudspeakers and supporting subwoofers provided controlled coverage across the activation. The system was balanced to deliver warm background music and clear speech reinforcement while maintaining a comfortable atmosphere for guests and hosts.

    Delivery Highlights 


    • Delivered the complete AV package for the Visit Saudi hospitality tent.
    • Installed large-format television displays across the guest environment.
    • Managed tourism and destination content through BrightSign media players.
    • Integrated live event feeds into selected displays.
    • Deployed L-Acoustics 5XT loudspeakers with supporting subwoofers.
    • Tuned the audio system for background music, announcements and guest engagement.
    • Provided installation, testing and on-site technical support.
    visit-saudi-dubai-outdoor-high-tables-2024

    Outcome


    The finished activation gave Visit Saudi a clear and engaging platform for connecting with guests throughout the Dubai 7’s. Tourism content, cultural storytelling and live event coverage worked together without distracting from the relaxed hospitality setting.


    Reliable audio and video systems kept the space operating smoothly during busy periods, helping strengthen the brand’s presence while giving visitors an accessible introduction to Saudi Arabia’s tourism offering.

    Project Ecosystem


    Client:

    Visit Saudi


    Evolution Technical:

    Provided the complete audio-visual production for the hospitality activation, including large-format displays, BrightSign content playback, live-feed distribution, professional audio systems and on-site technical support.


    Evolution Scenic:

    Custom fit out, walls, ceiling and flooring


    Evolution Site Services:

    Power distribution


    Evolution Furniture:

    Full furniture and decor

  • Published on

    Capital Markets Day

    adnoc-distribution-capital-markets-day-business-presentation

    Capital Markets Day 2024 brought ADNOC's senior leadership together with investors, analysts, international guests and industry representatives at the St. Regis Corniche, Abu Dhabi.


    The event provided a platform to share the organisation's financial performance, strategic direction and long-term vision, alongside curated site visits showcasing key assets.


    To support this high-profile programme, Evolution was responsible for delivering the complete technical production, ensuring every presentation, discussion and announcement was delivered with clarity, reliability and precision.

    The Challenge


    Capital Markets Day brought together senior executives, investors and international stakeholders for a programme where every presentation, announcement and discussion needed to be delivered without compromise.


    The production had to provide exceptional audio, high-quality visuals and reliable show communications, while integrating discreetly into the luxury hotel environment.

    In addition to supporting the live event, the programme also required a dependable broadcast solution for remote audiences.


    With limited access to a fixed network, the team deployed a portable wireless internet system to provide the bandwidth required for livestreaming and content transmission, ensuring stable connectivity throughout the event.


    Working within a compressed production schedule and the venue's rigging limitations, every technical system had to be carefully coordinated to ensure rehearsals, live presentations and broadcast operations ran seamlessly from start to finish.

    adnoc-capital-markets-day-live-camera-production-abu-dhabi

    The Solution


    A tailored production solution was developed around the needs of the event rather than a standard conference setup. High-resolution LED displays ensured presentations and financial content remained clear from every seat, while a professional audio system delivered consistent speech intelligibility across the venue.


    Lighting was designed to create a polished stage environment without distracting from the presenters, and a bespoke rigging solution enabled all technical infrastructure to be installed safely. Dedicated show communications kept every department connected, allowing the programme to progress smoothly from opening remarks through to the final session.

    Delivery Highlights 


    • Delivered complete turnkey technical production.
    • Installed large-format LED displays with dedicated media servers.
    • Provided professional audio systems for executive presentations and delegate engagement.
    • Designed stage and architectural lighting tailored to the venue.
    • Engineered bespoke rigging solution.
    • Deployed dedicated show communications for stage management and technical crews.
    • Managed installation, rehearsals, live operation and technical support throughout the event.
    adnoc-capital-markets-day-automation-video-led-screen

    Outcome


    The production provided a reliable platform for executive presentations, strategic announcements and investor engagement throughout Capital Markets Day. Every technical system worked together to support clear communication, high-quality visual content and a professional delegate experience without interruption.


    By combining careful planning with precise on-site execution, Evolution helped create an event environment that reflected the professionalism and international standing of ADNOC while enabling its leadership to communicate with confidence.

    Project Ecosystem


    Client:

    ADNOC 


    Evolution Technical:

    Provided the complete turnkey technical production, integrating LED display systems, professional audio, stage lighting, media servers, show communications, bespoke rigging solutions and on-site technical operations to support every session of the event.


    Evolution Events:

    Managed client engagement, production planning, logistics and event delivery, coordinating all stakeholders to ensure a smooth and efficient programme from build-up through to final execution.


    Evolution Scenic:

    Produced and installed the stage environment, branded scenic elements and presentation backdrops, creating a refined setting that reflected the stature of ADNOC's Capital Markets Day.


    Evolution Furniture:

    Delivered furniture for the stage, executive seating, delegate areas and VIP hospitality spaces, complementing the event's premium conference environment.


  • Published on

    ADNOC Energy 2024

    adnoc-energy-ai-live-video-production-control-abu-dhabi-2024

    ADNOC Energy.AI brought together senior leaders, technology specialists and industry experts to explore how artificial intelligence is shaping the future of operations across the energy sector.


    Evolution was appointed to deliver the complete technical production, providing an integrated AVL solution that supported keynote presentations, executive discussions, live streaming and multimedia content throughout the multi-day event.

    The Challenge


    ADNOC Energy.AI required a production environment that could support a content-driven programme while maintaining the professionalism expected of a high-level executive event. With keynote presentations, panel discussions, live demonstrations and streamed sessions taking place across multiple days, the technical infrastructure needed to deliver exceptional reliability, seamless content management and uninterrupted communication.


    The production also demanded close integration between audio, video, lighting and networking systems to ensure presenters, remote audiences and on-site delegates experienced consistent, high-quality delivery throughout the event.

    adnoc-energy-ai-audio-control-console-technical-crew-abu-dhabi-2024

    The Solution


    Evolution delivered a fully integrated AVL production that combined professional audio, intelligent lighting, live streaming, media server technology and advanced networking into a single, coordinated workflow. Every system was engineered to provide reliable performance while allowing presenters and production teams to manage live content efficiently throughout the programme.


    From stage lighting and rigging to real-time media playback and signal distribution, the technical solution provided the flexibility needed to support a fast-paced event focused on innovation and digital transformation.

    Delivery Highlights 


    • Delivered the complete AVL production for a multi-day executive forum.
    • Managed project planning, technical production and live show operations.
    • Installed L-Acoustics Syva loudspeakers with 5XT front-fill systems.
    • Supplied Yamaha digital audio control and Shure RF microphone systems.
    • Delivered live streaming infrastructure for remote audiences.
    • Managed multimedia playback using Ventuz media servers.
    • Distributed signals across a Luminex AVL network for reliable performance.
    • Installed stage lighting, room lighting and rigging infrastructure.
    • Provided dedicated technical crews for installation, rehearsals, live operation and dismantling.
    adnoc-energy-ai-keynote-led-stage-audience-abu-dhabi-2024

    Outcome


    The integrated production environment enabled keynote presentations, executive discussions and live content to run seamlessly across the multi-day programme. Professional audio, lighting, live streaming and content management worked together to create a polished experience for both in-person and remote audiences.


    The project highlighted Evolution's capability to deliver technically sophisticated corporate events where digital content, executive engagement and operational reliability are equally critical.

    Project Ecosystem


    Client:

    ADNOC 


    Evolution Technical:

    Planned and executed the complete AVL production, integrating professional audio, lighting, video, live streaming, media servers, networking infrastructure and on-site technical operations to support every stage of the event.


    Evolution Events:

    Oversaw client communication, production planning, project coordination and event delivery, ensuring smooth collaboration between all stakeholders and production teams from planning through to completion.


    Evolution Scenic:

    Designed, fabricated and installed the stage environment, presentation backdrops and branded scenic elements, creating a clean and professional setting that reflected the event's innovation-focused theme.


    Evolution Furniture:

    Provided furniture for the stage, speaker areas, delegate seating and hospitality spaces, supporting both the functional requirements and overall presentation of the event.


    Evolution Site Services:

    Delivered the temporary power infrastructure, supplying generators, primary power distribution and secondary distribution boards (DBs) to ensure uninterrupted power across all audiovisual and production systems throughout the event.

  • Published on

    Dubai Mall – Rigging for Ramadan 2024

    dubai-mall-ramadan-rigging-thumbnail-2024

    In March 2024, Evolution Technical was engaged by Soul Meta Production to deliver a complex rigging solution for Ramadan-themed decorations at Dubai Mall, one of the busiest and most iconic retail environments in the region.


    The project required the safe suspension of decorative pieces of varying sizes and weights at heights ranging from 7 to 20 metres, without interrupting daily mall operations. Working within restricted overnight installation windows, the project demanded detailed planning, specialist rigging expertise and professional execution.

    The Challenge


    Installing large-scale Ramadan decorations within one of the region's busiest shopping destinations required a rigging solution that balanced technical performance with operational efficiency.


    Decorative elements of varying sizes and weights needed to be safely suspended at multiple heights while ensuring the mall remained fully operational throughout the installation. With access limited to overnight working hours, every stage of the project had to be carefully planned and executed within tight timeframes.


    The installation also required precise positioning to create visual symmetry and maximise the decorative impact, complementing Dubai Mall's architecture while reflecting the cultural and spiritual essence of Ramadan.


    dubai-mall-ramadan-ceiling-truss-installation-2024

    The Solution


    To meet the project's technical demands and safety requirements, Evolution's rigging team designed and constructed a 34-metre-high flown truss grid system, providing a secure overhead structure from which all decorative elements could be safely suspended.


    Pre-measured steel suspension wires were prepared in advance to ensure accurate positioning and a streamlined installation process during the limited overnight access periods.


    Working exclusively overnight to align with the mall's operational schedule, the team completed the full installation within the allocated programme while maintaining the highest standards of safety.


    Decorative elements were strategically positioned to optimise both symmetry and visual impact, creating a striking Ramadan display that enhanced the mall environment while respecting the client's creative vision.


    Delivery Highlights

     

    • Complete rigging design and engineering
    • 34-metre-high flown truss grid system
    • Decorative suspension between 7 and 20 metres
    • Pre-measured steel wire suspension system
    • Overnight installation programme
    • Precision positioning for visual symmetry
    • Technical installation and project delivery
    • Safe execution within a live public environment
    dubai-mall-ramadan-truss-rigging-installation-2024

    Outcome


    The completed installation transformed Dubai Mall's public spaces with a visually striking Ramadan display while allowing the venue to continue operating without disruption.


    By combining detailed engineering, careful planning and specialist rigging expertise, Evolution successfully delivered a technically demanding installation safely, efficiently and on schedule. The project demonstrates Evolution's capability to execute complex, large-scale rigging solutions in high-profile public environments where safety, precision and operational continuity are paramount.

    Project Ecosystem


    Client:

    Soul Meta Production


    Venue

    Dubai Mall, Dubai, UAE


    Evolution Technical:

    Rigging Design • Flown Truss Systems • Decorative Rigging • Temporary Structures • Technical Planning • Installation Management • Overnight Installation • Health & Safety

  • Published on

    Nineteen – Museum Of The Future

    nineteen-museum-of-the-future-evolution-branded-screen-display

    For an exclusive property launch at the Museum of the Future, Evolution Technical was appointed by Looking Glass Events to deliver turnkey Technical management and AVL solutions for an immersive brand activation.


    Commissioned by a leading property developer, the event required a creative technical solution that complemented the venue’s iconic architecture while showcasing the client’s latest development portfolio.

    The Challenge


    Delivering technical production inside one of Dubai’s most distinctive venues required meticulous planning and coordination. Strict loading restrictions, limited access to the loading bay and tightly controlled installation windows meant every stage of the build had to be carefully scheduled. At the same time, all technical elements needed to blend seamlessly into the venue without compromising its architectural design.

    nineteen-museum-of-the-future-video-installation-thumbnail

    The Solution


    At the heart of the activation was a bespoke abstract TV installation, designed as the event’s visual centrepiece. Powered by Ventuz media servers, the installation delivered synchronised content playback and dynamic visuals throughout the presentation.


    To complement the visual experience, Evolution supplied a complete audio and lighting package that enhanced the atmosphere without distracting from the venue itself. Architectural lighting washes were carefully programmed to highlight key spaces, while discreet rigging solutions ensured all technical equipment remained integrated within the environment.

    Delivery Highlights 


    • Technical management for the complete event production.
    • Custom abstract TV installation serving as the feature display.
    • Ventuz media servers for synchronised content playback.
    • Professional audio system for presentations and ambient sound.
    • Architectural lighting designed to complement the venue.
    • Discreet rigging solutions integrated within the Museum environment.
    • Careful logistical planning to meet restricted loading and installation schedules.
    nineteen-museum-of-the-future-video-installation-rear-venue-view

    Outcome


    Despite the operational constraints of working within a landmark venue, the project was delivered smoothly from installation through to live operation.


    The combination of creative tech solutions, detailed technical management and carefully integrated AVL systems created an elegant and immersive guest experience, successfully reinforcing the client's brand and property launch while respecting the unique character of the Museum of the Future.

    Project Ecosystem


    Client:

    Looking Glass Events


    Evolution Technical:

    Technical Management • Audio • Lighting • Video • Media Servers • Rigging • AVL Integration


    Evolution Scenic:

    Custom stand for TV's & Truss Cladding


    Evolution Furniture:

    Furniture and decor supply

  • Published on

    Tech Roads Awards

    adnoc-techroad-awards-main-stage-header-2022

    For the Tech Roads Awards in Abu Dhabi, Evolution Technical was appointed to enhance the existing audio, video and lighting (AVL) infrastructure in the Murban Auditorium, delivering a polished technical production for a large corporate audience.


    The project combined the venue's permanent AVL systems with carefully selected supplementary equipment, creating a reliable, high-performance solution that supported presentations, award announcements and live event production while maximising the capabilities of the existing venue infrastructure.

    The Challenge


    Delivering a premium awards production within an established venue required seamless integration between permanent systems and temporary technical equipment.


    The production demanded clear speech reinforcement, dependable wireless microphone coverage, high-quality visual presentation and enhanced stage lighting, all while ensuring compatibility with the auditorium's existing infrastructure. The solution needed to improve production quality without disrupting venue operations or introducing unnecessary complexity.

    adnoc-techroad-awards-exhibition-floor-overview-link-2022

    The Solution


    Evolution Technical integrated the venue's existing PA system with a professional live audio workflow centred around a Yamaha CL5 digital mixing console and Yamaha RIO I/O racks, providing greater flexibility, control and audio performance throughout the event.


    Wireless audio was delivered using Shure UR4D receivers, supported by a combination of Shure UR1's with DPA lapel microphones, ensuring clear and consistent speech reproduction for presenters.


    Visual content was displayed using the auditorium's built-in LED screen, providing crisp, high-resolution playback for presentations, branding and multimedia content.


    To enhance the visual environment, Evolution supplemented the venue lighting with Robe BMFL fixtures and Astera AX5 wireless luminaires, improving stage lighting while creating a refined ambience that elevated the overall guest experience.


    By strategically enhancing the venue's permanent AVL system, Evolution delivered a dependable, efficient and technically robust production tailored to the requirements of a high-profile corporate awards ceremony.

    Delivery Highlights 


    • Complete AVL system integration
    • Yamaha CL5 digital audio console
    • Yamaha RIO I/O system
    • Shure UR4D wireless receivers
    • Shure UR1's with DPA lapel microphone systems
    • Venue LED screen integration
    • Robe BMFL performance lighting
    • Astera AX5 wireless lighting
    • Technical production management
    • Audio, lighting and video operation
    adnoc-techroad-awards-stage-speaker-presentation-2022

    Outcome


    The completed production delivered a seamless technical experience that enhanced every aspect of the Tech Roads Awards, providing exceptional audio clarity, professional visual presentation and refined stage lighting throughout the ceremony.


    By integrating high-performance technology with the venue's existing infrastructure, Evolution Technical delivered a reliable and efficient AVL solution that supported the event's objectives while demonstrating the company's expertise in corporate event production and technical system integration.

    Project Ecosystem


    Client:

    Roads and Transport Authority (RTA)


    Venue

    Murban Auditorium

    Abu Dhabi, UAE


    Evolution Technical:

    Technical Production • Audio Systems • Video Systems • Lighting Design • Wireless Audio • Corporate Event Production • Technical Management • AVL Integration


    Evolution Scenic:

    Scenic Build


    Evolution Site Services:

    Power distribution