• Published on

    ADNOC ENACT Majilis

    evolution-technical-adnoc-enact-majlis-branded-entrance-led-stage

    The ADNOC ENACT Majlis brought together C-suite executives, government representatives and key decision-makers from the energy sector for a high-profile forum focused on collaboration, innovation and industry leadership.


    Evolution Technical was appointed to design, supply and deliver a complete turnkey technical production solution, integrating professional audio, video, lighting and networking systems to create a seamless environment for presentations, panel discussions and executive engagement.

    The Challenge


    As a high-level executive forum, the ADNOC ENACT Majlis demanded exceptional technical precision and reliability.


    The production demanded crystal-clear audio, high-resolution realtime visuals, professional broadcast-quality video capture and clean lighting coverage within a venue that presented the team with rigging challenges and limitations.


    Every technical element had to operate seamlessly to support keynote presentations, panel discussions and live content, while allowing rapid adjustments during rehearsals without disrupting the event schedule. The solution also required robust networking infrastructure backbone to ensure synchronous communication between all audiovisual systems and operators.

    evolution-technical-adnoc-enact-majlis-leadership-address-circular-forum

    The Solution


    Through carefully planning & designed and delivered a fully integrated AVL solution tailored to the event's operational requirements. Large-format LED displays, professional audio systems, PTZ camera technology and wireless microphone systems were combined with dynamic lighting and advanced realtime media server control utilizing our VENTUZ media servers, to create a polished production environment.


    A custom ground support system overcame venue rigging restrictions, while high-speed Luminex networking enabled efficient content management, data streaming and inter-departmental communication throughout the event.

    Delivery Highlights 


    • Design, supply and delivery of the complete turnkey AVL solution.
    • Installation of multiple large format, high-resolution LED screens for keynote presentations, VT playback and live content.
    • Provision of L-Acoustics professional audio systems for exceptional audio clarity.
    • PTZ camera systems for live image capture and event coverage.
    • 60x channels of SHURE RF microphone systems for keynote speakers and panel discussions.
    • Design & delivery of a bespoke lighting solution to enhance the stage environment.
    • Design & engineering of a Litec truss ground support system to overcome venue rigging limitations.
    • Implementation of high-speed AVL networking utilizing Luminex 10GB switching & Fibre
    • VENTUZ real-time media server control for content management and ease of editing.
    • Complete on-site technical management and operational support throughout the event.
    evolution-technical-adnoc-enact-majlis-circular-seating-led-environment

    Outcome


    The ADNOC ENACT Majlis was delivered through a carefully integrated AVL solution that combined exceptional audio, high-impact visuals and dependable technical infrastructure. Designed to support executive presentations and panel discussions at the highest levels, the production created a professional environment where technology enhanced every aspect of the event without distraction.


    The successful delivery reinforced Evolution Technical's expertise in producing high-profile corporate and government events - where professional Technical production and execution alongside a dependable team are paramount.

    Project Ecosystem


    Client:

    ADNOC - ENACT


    Evolution Technical:

    Designed and delivered a fully integrated turnkey AVL solution, encompassing large-format LED displays, professional audio systems, PTZ camera technology, RF microphones, professional lighting, rigging, AVL networking, realtime media servers and comprehensive on-site technical support.


    Evolution Events:

    Managed client liaison, stakeholder coordination, project planning, production management and event delivery, ensuring every phase of the project was executed efficiently from pre-production through to live operation.


    Evolution Scenic:

    Created, fabricated and installed the event's scenic environment, including stage branding, presentation backdrops and bespoke scenic features that complemented the executive setting.


    Evolution Furniture:

    Provided and installed furniture solutions for the speaker areas, delegate seating and VIP hospitality spaces, enhancing both the functionality and presentation of the event environment.


    Evolution Site Services:

    Designed and delivered the temporary power infrastructure, supplying generators, primary power distribution and secondary distribution boards (DBs) to provide reliable power across all audiovisuals, lighting and production systems.

  • Published on

    Matchroom Pool & WST Snooker Championships 2025

    evolution-technical-world-pool-championship-multi-table-setup

    Over consecutive weeks in Jeddah's Green Halls, Saudi Arabia welcomed two of the world's most prestigious cue sports events, the Matchroom Pool Championship followed by the WST Snooker Championship. Together, the tournaments attracted elite players, international broadcasters and fans from around the globe.


    Supporting two world-class championships within the same venue required more than a conventional event setup. Evolution was responsible for managing the complete technical production, adapting the venue as each tournament progressed while maintaining uninterrupted broadcast operations, spectator experiences and competition schedules.

    The Challenge


    As the venue for two consecutive international Pool and Snooker championships, Green Halls needed to adapt continuously without affecting the competition. Practice areas, feature tables and broadcast facilities changed throughout the tournament schedule, requiring the technical infrastructure to be struck as the tournament progressed, then rebuilt in stages while maintaining uninterrupted event operations.


    At the same time, international broadcast feeds, live scoring and venue-wide displays had to remain perfectly coordinated, ensuring every match reached both on-site audiences and viewers around the world with the same level of quality architecture.

    evolution-technical-world-pool-championship-tournament-production

    The Solution


    A flexible production strategy was developed to support every stage of both championships. Lighting, audio, video and rigging systems were designed to adapt as competition areas changed, allowing the venue to transition efficiently from multiple active match tables to a single televised finals arena before being reconfigured for the next tournament.


    Broadcast integration formed a key part of the production, with incoming international feeds distributed across LED displays and venue screens while dedicated signal pathways connected live scoring systems throughout the venue. Networked infrastructure and special effects completed the production, delivering an engaging atmosphere for spectators while supporting international broadcast standards.

    Delivery Highlights 


    • Managed complete technical production across two international sporting championships.
    • Delivered professional lighting, audio, video and rigging systems throughout the venue.
    • Executed phased installation and dismantling of practice and competition tables.
    • Reconfigured the venue between the Pool Championship and WST Snooker Championship.
    • Integrated international broadcast feeds across LED displays and venue screens.
    • Distributed live scoring data to screens throughout the venue.
    • Installed networked AVL infrastructure to support venue-wide signal distribution.
    • Supplied special effects to enhance player presentations and championship moments.
    • Managed installation, live operations and technical support throughout both tournaments.
    evolution-technical-world-pool-championship-arena-led-lighting

    Outcome


    The phased production approach enabled two major international championships to be delivered within the same venue while maintaining consistent technical performance from opening matches through to the final presentations. Broadcast operations, venue technology and competition requirements remained fully aligned throughout every stage of both events.


    The project demonstrated Evolution's ability to manage complex sporting productions where venue transformation, international broadcasting and live event operations must work together under demanding schedules.

    Project Ecosystem


    Client:

    Matchroom / STAMINA


    Evolution Technical:

    Managed the complete technical production for both championships, delivering professional audio, lighting, video, rigging, broadcast integration, scoring distribution, special effects and on-site technical operations throughout the venue.


    Evolution Site Services:

    Provided temporary power distribution and supporting electrical infrastructure to ensure uninterrupted operation of all AVL, broadcast and production system

  • Published on

    LIV Golf 2025

    liv-golf-riyadh-2025-blue-concert-stage-header

    Evolution Technical designed, delivered and operated the festival-style Main Stage for the 2025 edition of LIV Golf Riyadh, creating a high-performance live entertainment environment within one of the region’s leading sporting events.


    Working alongside Leaders, SELA and LIV Golf, the team delivered a touring-standard production platform for international and regional artists, supported by integrated audio, lighting, video, rigging, stage management and on-site technical operations across the three-day tournament.


    Evolution’s scope extended beyond the Main Stage. Across the wider site, the team designed and deployed a series of technical guest-experience features, including a drive-through feature truss arch with integrated lighting, a bespoke ground-supported truss structure with custom angles and Astera Titan Tubes, and an immersive DJ maze built from approximately 500 illuminated IBC tanks. Each IBC fixture was centrally controlled via media server, allowing synchronised animations to run throughout the installation.


    Together, these elements helped connect the live music programme, tournament environment and guest journey into one cohesive event experience.

    The Challenge


    LIV Golf Riyadh 2025 required a Main Stage capable of supporting festival-quality live entertainment within the operational setting of a major international sporting event.


    The stage needed to meet the technical expectations of recognized international artists while also accommodating regional performers, rapid changeovers and a three-day entertainment schedule. Audio, lighting, video, rigging and stage management all had to work as a single coordinated system, with enough flexibility to respond to artist requirements and the pace of live event delivery.


    Beyond the Main Stage, Evolution was also contracted to deliver original technical and interactive features across the site. These included illuminated entrance structures, a custom VIP/vehicle tunnel experience and an immersive DJ maze installation designed to create strong visual impact for guests moving through the entertainment zone.

    liv-golf-riyadh-2025-event-entrance-header

    The Solution


    Evolution Technical designed and delivered the fully integrated festival-style Main Stage, combining professional staging, touring-grade audiovisual systems and experienced technical management.


    The Main Stage production was produced by Evolution Technical and included a high-performance stage structure, a professional D&B audio system specified for live music and touring performances, a dynamic concert lighting rig suitable for specific artist requirements and high-resolution LED video surfaces. Camera feeds sent to large format IMAG screens improved audience visibility across the venue, while the lighting and video systems created the scale and atmosphere expected from a major music performance environment.


    Led by our HOD as Technical Director for the project, the team also managed the complete technical delivery around the stage, including rigging, system integration, stage management, technical crew and on-site production support. This allowed artist changeovers, show calls and live entertainment operations to run efficiently throughout the tournament.


    Across the wider site, Evolution Technical delivered several custom-built technical experiences. A drive-through feature truss arch was designed with integrated lighting to create a strong arrival moment for vehicles and guests. A bespoke ground-supported truss structure, built with custom angles and fitted with Astera Titan Tubes, added movement, colour and visual energy to the entertainment zone entrance.


    For the DJ maze experience, Evolution deployed approximately 500 illuminated IBC tanks as controllable lighting fixtures. Each unit was connected to a central media server, enabling synchronised animations and coordinated visual sequences throughout the installation. The result was an immersive, programmable environment that combined scenic scale with bespoke technical control.

    Delivery Highlights


    • Festival-style Main Stage designed, delivered and operated by Evolution Technical
    • Touring-standard audio, lighting and video systems for live artist performances
    • High-resolution LED video walls and live IMAG screens
    • Complete rigging, stage management and technical crew support
    • Three-day live entertainment programme integrated into a major sporting event
    • International and regional artist performances supported on one production platform
    • Drive-through feature truss arch with integrated lighting
    • Bespoke ground-supported truss structure with custom angles
    • Astera Titan Tube lighting integration for the entertainment zone entrance
    • Immersive DJ maze built from approximately 500 illuminated IBC tanks
    • Central media server control for synchronised IBC lighting animations
    • Wider site technical features supporting guest flow, arrival moments and visual impact
    liv-golf-riyadh-2025-dj-pyrotechnic-performance

    Outcome


    Evolution Technical delivered a festival-scale live entertainment environment that integrated with the LIV Golf Riyadh 2025 tournament experience.


    The Main Stage provided a robust, professional platform for international and regional performers, while the wider technical installations added energy, movement and visual identity across the site.


    By combining touring-standard production systems with custom-built guest-experience features, Evolution helped create an entertainment-led sporting event that felt connected from guest arrival through to each artist performance.

    Project Ecosystem


    Client:

    Leaders, SELA & LIV Golf


    Evolution Technical:

    Designed, supplied and delivered the complete festival-style mainstage, including staging, professional audio, concert lighting, LED video systems, IMAG screens, rigging, stage management, technical crew and on-site production support for three days of live entertainment.


    Evolution Events:

    Managed client coordination, project management, production planning and on-site delivery, ensuring collaboration between the client, production teams and event crew throughout the project.


    Evolution Scenic:

    Designed, fabricated and installed the main entrance arches, branded logos and bespoke stage woodwork, creating a cohesive visual identity across the event.


    Evolution Furniture:

    Supplied bespoke stage furniture to complement the mainstage design and support the event's production requirements.


    Evolution Site Services: 

    Managed and oversaw all power requirements for Evolution's scope, provided secondary power cabling & distribution, as well as deploying fencing and trackway across site


  • Published on

    E1 Jeddah GP 2025

    e1-jeddah-gp-2025-fanzone-lighting-network

    Following the successful delivery of the inaugural event, Evolution Technical returned to the E1 Jeddah GP in 2025 to provide a complete AVL and network infrastructure package across the Fanzone and Hospitality areas. Spanning a significant section of the Jeddah Corniche, the project supported fan engagement, premium hospitality and broadcast operations, requiring a robust technical solution capable of operating across multiple event zones.

    The Challenge


    The event required a reliable technical infrastructure capable of supporting thousands of visitors across a large outdoor site while simultaneously delivering broadcast connectivity, hospitality services and guest experiences. With multiple technical systems operating across the venue, seamless integration between audiovisual, networking and communications was essential to ensure uninterrupted event operations.

    e1-jeddah-gp-2025-hospitality-led-stage

    The Solution


    Evolution delivered a comprehensive technical package tailored to the demands of the open-air venue. Large-format IMAG displays, distributed audio systems and architectural lighting enhanced the Fanzone experience, creating an engaging environment for spectators throughout the event.


    A dedicated fibre backbone and network infrastructure were installed across the site, supporting guest Wi-Fi, hospitality operations, broadcast connectivity and critical event communications. Evolution also managed the complete AVL network, ensuring all technical systems operated as a single integrated platform with reliable performance across every event zone.

    Delivery Highlights 


    • Complete AVL production across the Fanzone and Hospitality areas.
    • Large-format IMAG displays for live race coverage.
    • Distributed audio systems for public engagement.
    • Architectural lighting throughout the activation spaces.
    • Dedicated fibre backbone and site-wide network infrastructure.
    • Guest Wi-Fi and hospitality network integration.
    • Broadcast IT connectivity and signal distribution.
    • Technical coordination and integrated AVL system management.
    e1-jeddah-gp-2025-illuminated-event-signage

    Outcome


    Building on the success of the previous edition, Evolution delivered a scalable and dependable technical solution that supported every aspect of the event experience. From fan engagement and hospitality to broadcast connectivity and network management, the integrated AVL and fibre infrastructure ensured reliable performance throughout the E1 Jeddah GP, reinforcing Evolution's position as a trusted technical partner for international sporting events.

    Project Ecosystem


    Client:

    E1 Series


    Venue

    Jeddah Corniche, Saudi Arabia


    Evolution Technical:

    Technical Management • Audio • Lighting • Video • IMAG • Fibre Networking • Broadcast Connectivity • Hospitality Infrastructure


    Evolution Site Services:

    Site Power and distribution

  • Published on

    E1 Jeddah 2024

    e1-jeddah-gp-2025-illuminated-event-signage

    The inaugural E1 Series Electric Boat Race made its debut in Jeddah KSA, bringing together world-class racing, international broadcast partners and thousands of spectators for a landmark sporting event on the Red Sea.


    Appointed as the Technical production partner, Evolution Technical managed the delivery of all AVL systems across the race venue, supporting the Fan Zone, hospitality areas, broadcast operations, prize-giving ceremony and the official E1 Gala Dinner.


    The project required close coordination across multiple event environments while meeting the technical standards expected of a global live sporting broadcast.

    The Challenge


    Unlike a traditional event, the E1 Series operated across several independent production zones, each with its own technical requirements and operating schedules.


    Live race coverage, public engagement, hospitality experiences and broadcast operations all needed to run simultaneously while sharing critical audio and video content across the venue.


    Managing incoming international broadcast feeds, distributing live content to multiple display locations and maintaining reliable communications across the site required a resilient technical infrastructure capable of supporting both live television production and the spectator experience.

    e1-jeddah-gp-2025-fanzone-lighting-network

    The Solution


    Evolution developed a site-wide production network that connected every key event space into a single coordinated workflow. Broadcast feeds, live race coverage and event content were distributed across large-format LED screens, IMAG displays and hospitality monitors, ensuring audiences remained connected to the action regardless of their location.


    A dedicated lighting package transformed the Fan Zone throughout the event, while special effects including cold spark fountains and CO₂ jets added impact to the prize-giving ceremony. Beyond the race venue, Evolution also delivered the complete audiovisual production for the official E1 Gala Dinner, creating a premium setting for invited guests and stakeholders.

    Delivery Highlights 


    • Managed technical production across multiple event zones.
    • Coordinated incoming international broadcast feeds and site-wide content distribution.
    • Installed 3.9mm outdoor LED screens, IMAG displays and hospitality TV systems.
    • Delivered a high-capacity audio and video networking infrastructure across the venue.
    • Designed and operated lighting for the Fan Zone using beam, spot and wash fixtures.
    • Supplied cold spark and CO₂ special effects for the prize-giving ceremony.
    • Delivered the complete AVL production for the official E1 Gala Dinner.
    • Provided on-site technical management and operational support throughout the event..
    e1-jeddah-gp-2025-hospitality-led-stage

    Outcome


    The technical infrastructure enabled every part of the E1 event to operate as one connected production, from live race coverage and fan engagement to hospitality experiences and the official prize-giving ceremony. Reliable broadcast integration, venue-wide content distribution and coordinated technical management ensured a consistent experience for spectators, partners and international broadcasters alike.


    The successful delivery highlighted Evolution Technical's capability to manage large-scale sporting events where live broadcast, entertainment and audience experience must operate seamlessly across multiple venues and production environments.

    Project Ecosystem


    Client:

    STAMINA


    Evolution Technical:

    Delivered technical management and complete AVL production across the race venue, including broadcast integration, LED displays, audio systems, lighting, networking infrastructure, IMAG, special effects and technical support for both the race event and Gala Dinner.


    Evolution Events:

    Managed project coordination, production planning, client communications and on-site event delivery, ensuring all production partners and stakeholders remained aligned throughout the event.


    Evolution Furniture:

    Supplied furniture solutions for hospitality areas, VIP lounges, the Gala Dinner and operational spaces, supporting both guest comfort and venue presentation.


    Evolution Site Services:

    Provided temporary power infrastructure, including generators, primary power distribution and secondary distribution boards (DBs), ensuring uninterrupted power across all AVL, broadcast and production systems.

  • Published on

    Al Wathba Union Parade 2024

    al-wathba-tribal-parade-crowd-filled-stands-2024

    In December 2024, the Al Wathba Union Parade brought together thousands of visitors to celebrate the UAE's National Day with a large-scale public event featuring live performances, ceremonial moments and a spectacular parade experience.


    Appointed by the UAE Presidential Court, Evolution Technical was selected to design, supply and deliver a comprehensive AVL solution across the Grandstand, VIP hospitality areas, back-of-house facilities and mobile parade units, ensuring seamless technical integration across the entire event site.

    The Challenge


    Delivering the Al Wathba Union Parade required a robust and highly coordinated technical production solution capable of supporting a large-scale public celebration across multiple event zones. The production needed to provide consistent, high-quality audio, video and communications for the main stage, VIP hospitality areas, back-of-house operations and mobile parade units, all operating simultaneously.


    With large audiences spread across an expansive outdoor venue, maintaining synchronized audio, reliable signal distribution and uninterrupted communications was critical. The technical infrastructure also needed to integrate seamlessly with the event environment, ensuring safe cable management, efficient operations and flawless performance throughout the celebration without disrupting the visitor experience.

    al-wathba-tribal-parade-fortress-wall-landscape-2024

    The Solution


    Evolution Technical team delivered a fully integrated AVL infrastructure designed to provide reliable performance across every area of the event. Large-format LED displays, a premium Audio system, digital audio control, professional microphone systems and advanced networking technologies were combined to ensure consistent coverage, synchronized communications and seamless production throughout the parade.


    Supporting infrastructure, including custom Litec truss bridging systems, provided safe and efficient cable management while preserving the visual presentation of the venue.

    Delivery Highlights


    • Designed, supplied and delivered the complete AVL solution for the event.
    • Installed four 16m × 9m large-format LED screens for venue-wide visibility.
    • Deployed an L-Acoustics sound system powered by LA12X amplifiers.
    • Managed audio control using Yamaha CL5 digital mixing consoles and a Yamaha Dante network.
    • Supplied Shure RF and wired microphone systems for live performances and announcements.
    • Implemented a Luminex network to connect the Main and Satellite PA systems across the site.
    • Integrated Neutrik Xirium wireless audio for low-latency signal transmission between remote event zones.
    • Designed and installed a custom Litec truss bridge system to support back-of-house cable management.
    • Provided on-site technical management and operational support throughout the event..
    al-wathba-tribal-parade-green-guards-flag-ceremony-2024

    Outcome


    Our Technical team successfully delivered a highly coordinated AVL solution that supported every aspect of the Al Wathba Union Parade. From crystal-clear audio and large-scale LED displays to reliable networking and production infrastructure, the integrated solution ensured seamless event operations while enhancing the experience for thousands of attendees celebrating the UAE's National Day.


    The project demonstrated Evolution's ability to manage complex, large-scale public celebrations through precision planning, technical expertise and flawless on-site execution.

    Project Ecosystem


    Client:

    Presidential Court UAE


    Evolution Technical:

    Designed, supplied and delivered the complete AVL solution, including professional audio systems, large-format LED screens, networking infrastructure, digital audio control, microphone systems, rigging and on-site technical support across the main stage, VIP areas and parade route.


    Evolution Events:

    Led client coordination, stakeholder management, project planning, production management and on-site delivery, ensuring seamless collaboration between the client, suppliers and production teams throughout the project.


    Evolution Scenic:

    Designed, fabricated and installed scenic elements, branded structures, feature installations and custom event branding across the venue, supporting the visual identity of the celebration.


    Evolution Furniture:

    Supplied and installed furniture solutions for VIP hospitality areas, operational spaces and event facilities, ensuring comfort and functionality throughout the venue.